"I got 12 estimates from various roofing companies before I decided on White Leaf. Andy seemed very knowledgeable and did a good job communicating my options. The crew showed up on time, worked hard, and cleaned up after they were done."
Lowell Luplow Underlayment replacement · 12 estimatesRoof replacement · Gilbert, AZ · ROC #325377
Roof replacement in Gilbert, AZ
If your Gilbert roof is at the end of its road, you don't need a sales pitch. You need a fair bid, good materials, and a crew that shows up. I'm Andy Johnson, the owner, and I handle every Gilbert estimate myself, free, with real material samples in hand.
Most replacements take 4 to 5 days. Financing available.
The Gilbert reality
Half of Gilbert doesn't need new tile. It needs new felt.
Before you pay for a "full roof replacement," hear me out. On most Gilbert tile roofs, the tile itself has decades left. What dies at 15 to 20 years is the underlayment, the felt layer that actually keeps water out of your house.
So the smart version of a replacement here is often a tile underlayment replacement: we lift your tiles, install new underlayment, and relay the very same tiles. You get what matters (new waterproofing) without paying for what you don't need (tile you already own). One customer, Lowell, collected 12 estimates before landing on us for exactly this job.
And when a roof genuinely needs everything replaced, I'll say so plainly and show you why. Either way you're choosing from real underlayment samples at different price and quality points, not a line item on a quote.
Materials for Gilbert homes
Four ways to roof a Gilbert house
Tile
What most of Gilbert already has, and for good reason. Concrete tile handles our heat and monsoons beautifully as long as the underlayment beneath it stays healthy.
Existing tiles often reusableShingle
The most affordable path to a new roof, with a typical 15 to 20 year service life. Modern architectural shingles hold up to Arizona sun far better than older generations did.
Budget-friendly and reliableFoam & flat
For flat-roofed sections and additions, spray foam seals and insulates in one system and pairs well with solar. Kept on a proper coating schedule, it lasts; neglected, it doesn't.
Recoat-or-replace, answered honestlyHow the job runs
4 to 5 days, start to spotless
Free inspection & samples
I walk the roof, then sit down with you and real material samples. You pick the option that fits.
Schedule around you
We plan timing around your life and the weather. Third-party financing is there if you want it.
Protect everything
Landscaping covered, driveway shielded, and a magnet sweep for nails. Cleanup happens daily.
Owner on site
I'm not the guy who disappears after the contract. I'm there through the job and a text away after it.



Replacement customers talking
People who compared and chose us
"I have been a general contractor for 45 years. Andy and his crew are one of THE BEST subs I have worked with in my career. My only regret is that I can only give them 5 stars. This is a 10 star company all the way."
James Barret General contractor, 45 years"I got bids from 4 more different companies but we decided on White Leaf. Not only did they provide quality work in a timely manner, they were also the most reasonable in cost. No nickel and diming with extra costs."
Patrick Calalang Full roof replacementGilbert replacement questions
Worth knowing before you bid it out
How long will my Gilbert roof replacement take?
Most Gilbert homes wrap up in 4 to 5 days, depending on the roof's size and complexity. You'll know the schedule before we start, and my crew cleans the site at the end of every day, so you're never living in a construction zone.
Do I have to buy new tiles when I replace my roof?
Often, no. If your existing tiles are in good condition, we lift them, install new underlayment, and relay the same tiles. You pay for the waterproofing your roof actually needs instead of tile you already own. It's one of the most common jobs we do in Gilbert.
When is the best time of year to replace a roof in Gilbert?
We replace roofs year-round. Demand spikes right before and during monsoon season, so if you know the roof is due, scheduling in the cooler months usually means more flexibility. Either way, don't let a known problem ride through another storm season.
What does a roof replacement cost in Gilbert, AZ?
It comes down to the size of the roof, the material, and which underlayment you pick, so I bid every job individually and the inspection and estimate are free. I bring real samples so you choose your own price and quality point, and I'm almost always able to beat the big companies' bids.
Can I finance a roof replacement?
Yes. Third-party financing is available, and I'll walk you through the options at the estimate. No pressure either direction, it's simply there if spreading out the cost works better for you.
Want ballpark numbers before calling anyone? Start with the Arizona roof replacement cost guide. If the damage might still be fixable, read about Gilbert roof repair, or let me settle the question with a free Gilbert roof inspection. Everything else we do in town is on the Gilbert roofing page.
Free inspection · Free bid · ROC #325377
Bid your Gilbert roof the honest way
Call or text me. I'll walk the roof myself, show you real samples, and give you a number the big companies will have a hard time matching.
White Leaf Roofing · 3210 S. Gilbert Rd Ste. 1, Chandler, AZ 85286